The Slovak government has announced the handover of Sliač military airport after reconstruction. The site is due to become the permanent base for Slovakia’s new F-16 fighter aircraft, which are currently stationed at Kuchyňa and are already involved in protecting the country’s airspace.
Prime Minister Robert Fico said at the ceremony that the work was completed in 18 months rather than the 48 months originally expected. He put the cost at €49 million, compared with an initial estimate of €75 million. These are figures and comparisons stated by the prime minister; the announcement does not include a separate cost breakdown or an independent audit.
Fico described the infrastructure work as covering the equivalent of several dozen football pitches, involving about 12,000 truck journeys and hundreds of kilometres of pipes and cables. The government says the result is military infrastructure needed to operate the F-16s and protect Slovakia’s airspace.
The prime minister also expressed hope that the airport would soon connect to civilian infrastructure and serve residents of the Banská Bystrica region. The official material presents this as his expectation: it contains no specific decision, launch date for civilian flights or approved timetable.
Source
Úrad vlády SR · Read at the source ↗
Prepared by Afisha using the source announcement.